Scheduling exactly when a full backup occurs in an incremental backup scheme
I'm just reviewing Acronis vmProtect 8 and experimenting with options. Having a full backup occur every night is excessive in that the system would end up backing up continuously. The following combination works well for the system context except there is no control over when the full backups occur.
a) Backups in separate files.
b) Create a Full backup if existing incremental backups are older than 7 days.
c) Automatically delete old backups using the Simple Scheme and their older than X days
The preference is to be able to schedule which day of the week a full backup is performed on a per VM basis rather than leaving it to a rotating cycle which relies on the dates of the existing backup files. Its difficult to then spread the full backups of different virtual machines across different days of the week.
Can I create two separate tasks which have the same settings and backup destination but differ only in the number of days before a full backup is performed?
Can multiple tasks co-exist with the same backup destination and archive file names and not clash with each other? i.e. work with the same backup file set.
Is there any other way to control exactly which day of the week full backups occur?