Skip to main content

schedule option

Thread needs solution

hello i have a question : i have created a full disk image backup ,choosing not schedule marking box.but today when i open backup window to create a second full disk image backup , i noticed that the schedule option is ''weekly on friday''(the presetting option).so i want to know if i can choose permanently the option ''do not schedule''.or must choosing it , every time i want to create a backup without schedule?sorry for my bad english

Attachment Size
khoris_titlo.jpg 89.97 KB
khoris_titlo1.jpg 209.38 KB
0 Users found this helpful

Change your existing backup task from scheduled to "do not schedule". the link below shows you how.
To repeat your backup, click the "Back Up Now" optoin from inside your existing task.

GH0. 56872: New! Grover's How to Backup 2014 from within Windows.

GH1. How to change a backup task from scheduled to "Do Not Schedule".

GH2. How to enable a backup task schedule or change a schedule time..

GH3. How to create a non-scheduled backup task on the first try.

You may find my signature link 2-A to be of help.

thank you but i know all of these.i mean if i c an change by default the schedule option to off

No. The program has a preset configuration that the task being created will be a "scheduled" task unless the user changes the setting to "do not schedule" FOR THAT SPECIFIC TASK BEING CREATED.

So, the net result is during task creation, if you do not want your task (being created) to be a scheduled task, you need to change the projected configuration from scheduled to "do not schedule" BEFORE saving the task.

GH3. How to create a non-scheduled backup task on the first try.

If the new task is saved as a scheduled task, it is not too late to change to " do not schedule" either before or after usage.
GH1. How to change a backup task from scheduled to "Do Not Schedule".

Link added:
GH4. Illustrate Manual Backup Now option or Repeat backups.