Scheduling multiple Backups Overnight - a new idea
I have Drives C, D, E, F, and G
It is tricky to get the scheduling arranged. I want to do nightly Incrementals - where the first Backup is always a Full and then you set how many Incrementals ro run before the entire set is deleted and the sqequence starts over with a Full.
I set all drives to backup 14 times - then a new set is started and the old set deleted.
I set them to run at 2 AM, 3 AM, etc (1 hour apart). BUT when it reaches the 15th night a FULL backup is executed and this will take more than 1 hour.
If the 2 AM backup does not complete until 3:30 - I do not know if the 3 am backup will start at 3 am and run concurrently with the still executing 2 am backup, or if it will wait for the 2 am backup to complete (i.e. it would be placed in a queue). I assume that it waits in a queue but I am not sure.
If it waits and the 3 am, 4 am, etc backups all end up being placed in a queue . . . why not just set all the backups to run one minute apart - at 2:00 AM, 2:01 AM, 2:02 AM, etc. This way I can be assured they will always run one right after the other and will never "wait" for their time to arrive. The advantage is that they will always finish in the shortest time possible. It will not take from 1 AM to well past 6 am to finsh all backups. So if I wake up at 5 am to do some work, all the backups will have completed since they no longer have to wait one hour in between. Will this 2nd method of scheduling work ?? Or will they all run concurrently (I do not want that).
ls
.

- Log in to post comments