How do i change the order of the machines that are backed up?
Thread needs solution
I have Acronis Backup and Recovery 11. I have 5 agents installed on windows machines. I have the manegement server installed on another machine. The backups work OK but how do i change the order of the machines that are backed-up? For example, currently the order is:
Machine A
Machine B
Machine C
Machine D
Machine E
I want to change that order to:
Machine D
Machine A
Machine B
Machine C
Machine E
Is this possible?
Thanks.
Do, 04/19/2012 - 13:29