Direkt zum Inhalt

Switching from full to incremental backup

Thread needs solution

Hi,

I have installed ATIH 2012 and made a full backup. Then I modified the backup settings and switched the scheme to incremental, pointing to the same TIB file. I added a schedule to the settings.

Is this enough to be sure that the next scheduled backup will actually be incremental or will ATIH re-create a new full backup first ?

Thanks in advance.

0 Users found this helpful