ATI 2013 Build 6541 -Problem with scheduled backups

Thread needs solution

Hi,

I have an existing True Image scheduled job that creates a daily differential image backup.

The initial setup of that backup was that the source drive was a hdd with letter N: and the target hdd was drive X:

Recently I changed that setup, and deleted the old backup job from the list of scheduled backups
and created a new one with these settings:
Source drive X:, target drive M:

The backup itself runs ok, however strangely ATI creates two empty folders,
one on drive X with the same foldername specified with the previous (deleted) backup Job (e.g: X:\MyBackups\ImageDiskN\dailyBackup)
and the same on the new target drive (e.g.: M:\MyBackups\ImageDiskN\dailyBackup)

Any ideas on how to troubleshoot is greatly appreciated.

Thanks
Bodo

0 Users found this helpful

I think it is something that "is" and not much you can do to stop thesef folders from being created--maybe a fix in a future version.

Look at link #2 below and look at my example 11-Dif. The illustration is one example of how to setup the backup scheme for automatic deletion of old backups.

Thanks GroverH for your explanations and tutorials,
well worth reading, esp. the "switch disk mode" option, wich I
never used before.