Two or more tasks scheduled to the same time ! HELP ME !
Hey guys,
I use True Image Home V 10 / Windows XP PRO
Can anybody help me about what is supposed to happen if I create, per example,
1) One scheduled task to 2pm and another to 2h05pm * ? Will the task scheduled to 2h05 start ?
2) Two or more tasks scheduled to the same excatly time * ?
* all from the same source disk (full computer backup), to the same external disk, but with different backup names.
Thank you !
Cheers,
Carlos

- Se connecter pour poster des commentaires

Hi,
Although I hesitate to contradict a moderator, I don't believe the answer given is correct!
I have two sheduled tasks; the first is set to run at 3.23am every day. The second is set to run at 3.25am every Sunday. The logs show that, for example on Sunday 17th Jan, the 1st task started at 03.23.03am, as expected, and completed at 03.26.55am. The 2nd task then started 2 secs later at 03.26.57am. In other words any multiple request for tasks to run (whether manually or scheduled) are processed serially.
Cheers, Jim
- Se connecter pour poster des commentaires