Hi,
I have an existing True Image scheduled job that creates a daily differential image backup.
The initial setup of that backup was that the source drive was a hdd with letter N: and the target hdd was drive X:
Recently I changed that setup, and deleted the old backup job from the list of scheduled backups
and created a new one with these settings:
Source drive X:, target drive M:
The backup itself runs ok, however strangely ATI creates two empty folders,
one on drive X with the same foldername specified with the previous (deleted) backup Job (e.g: X:\MyBackups\ImageDiskN\dailyBackup)
and the same on the new target drive (e.g.: M:\MyBackups\ImageDiskN\dailyBackup)
Any ideas on how to troubleshoot is greatly appreciated.
Thanks
Bodo
- Accedi per poter commentare
Thanks GroverH for your explanations and tutorials,
well worth reading, esp. the "switch disk mode" option, wich I
never used before.